Don’t miss anything!

Subscribe to our newsletter to stay up to date on the wind energy industry.

Sign Up

The future of wind energy – Turbine innovations from Enercon, Vestas, and Nordex

The Enercon E-175 EP5, Vestas V172-7.2 MW, and Nordex N175/6.X are turbines to watch in the coming years, each bringing innovations that enhance performance while cutting costs. Here’s a closer look at what makes them stand out.

Enercon E-175 EP5

Anticipation is building as the Enercon E-175 EP5 prepares for its full market launch in 2026, but its prototype is already turning heads across Europe. Installed at select wind farms, the prototype is undergoing rigorous testing, providing valuable insights that allow engineers to perfect its performance under real-world conditions.

The E-175 EP5 features a two-piece permanent magnet generator that increases its power output from 6.0 MW to 7.0 MW. This makes it particularly suitable for medium wind regions, optimizing energy capture even in less-than-ideal conditions. Additionally, Enercon’s direct-drive technology significantly reduces maintenance needs by eliminating common mechanical issues. Fewer breakdowns mean lower operating costs, making it a practical and profitable solution for operators.

With a hub height of 175 meters and a rotor diameter to match, this is Enercon’s tallest turbine yet. The larger rotor is designed to capture more wind, making it particularly effective in areas with moderate wind speeds. The extra height ensures that the turbine can capture energy that might otherwise be lost in lower wind patterns.

One of the biggest challenges with turbines of this size is transportation. Enercon has addressed this by designing the generator in two parts, simplifying transport to even the most remote wind farms. This attention to logistical detail makes the E-175 EP5 a versatile and practical solution for a wide range of wind energy projects.

In keeping with Enercon’s commitment to quality, parts for the E-175 EP5 are sourced from several European countries, including Germany, Portugal, and Poland. This localized supply chain ensures superior quality control while avoiding potential delays, further enhancing Enercon’s reputation for reliability and efficiency.

Vestas V172-7.2 MW

Launched in 2024, the Vestas V172-7.2 MW is quickly becoming a favorite in the wind energy sector. Vestas has focused on flexibility and performance, creating a turbine that adapts to varying wind conditions while maintaining a high level of energy production.

One of the key features of the V172-7.2 MW is its customizable power output. Depending on site conditions, it can deliver between 6.5 MW and 7.2 MW, making it a highly adaptable choice for operators. Thanks to its advanced drive and conversion systems, the turbine’s energy output increases by 12% in low-wind conditions, making it particularly efficient in medium-wind environments.

With a rotor diameter of 172 meters, the V172-7.2 MW maximizes energy capture, even at low wind speeds, making it ideal for large-scale wind farms. Its versatility shines in different climates, as the turbine is equipped with optional features like the CoolerTop system for hot climates and cold climate packages for more extreme weather conditions. This adaptability ensures optimal performance, no matter where it’s installed.

Transportation and maintenance are often pain points in the lifecycle of a wind turbine, but Vestas has addressed these concerns head-on. The modular components of the V172-7.2 MW make it easier to transport to different locations and simplify future upgrades. This long-term serviceability and ease of installation make the V172-7.2 MW an attractive choice for operators looking to reduce downtime and maintenance costs.

Nordex N175/6.X

Currently in the advanced prototype phase, the Nordex N175/6.X continues to demonstrate its potential in the field. The first prototype was installed at a wind farm in Germany, and as of early 2025, a second prototype has been erected on a taller 179-meter tower, providing valuable performance data under varied site conditions.

The N175/6.X offers power ratings starting at 6 MW, with ongoing testing confirming its ability to scale up to approximately 6.8 MW, depending on environmental factors and configuration. With a rotor diameter of 175 meters and 86-meter blades, the turbine is engineered to efficiently harness wind even in low-to-moderate wind zones.

What continues to set the N175/6.X apart is its adaptability. Its modular tower system allows deployment at different heights, optimizing performance whether in lower-speed regions with taller towers or higher-speed regions using shorter setups. This makes it a flexible solution for both large utility-scale wind farms and distributed energy projects.

Nordex has focused on durability and reliability, using a robust drivetrain and low-maintenance components. Field data has supported claims of reduced downtime and lifecycle costs, solidifying its position as a cost-effective long-term investment. While still undergoing prototype evaluation, full commercial availability is expected by late 2025 or early 2026.

A bright future for wind energy

The world of wind turbines is in constant motion, with companies across the industry driving innovation. Each new model brings advancements in performance, energy capture, and cost-efficiency. As materials, designs, and grid integration continue to improve, the future of wind energy looks promising.

Don’t miss anything!

Subscribe to our newsletter to stay up to date on the wind energy industry.

Sign Up

Related articles

Technology
Sensing the future – Why wind farms should use predictive maintenance

Sensing the future – Why wind farms should use predictive maintenance

Technology
The evolution of wind turbines – Balancing size and efficiency with next-generation gearbox bearings

The evolution of wind turbines – Balancing size and efficiency with next-generation gearbox bearings

Wind News
Pushing the limits – Record-breaking wind turbines

Pushing the limits – Record-breaking wind turbines